Abstract
CAMBRIDGE.—The syndicate appointed to consider the steps to be taken for the erection of a building for the Department of Agriculture reports that the erection of the building is now practically completed, and the fittings sanctioned are in a forward state. The syndicate anticipates that the building will be ready for occupation by the department at the beginning of the Lent term of 1910.
Article PDF
Rights and permissions
About this article
Cite this article
University and Educational Intelligence . Nature 82, 145–146 (1909). https://doi.org/10.1038/082145b0
Issue Date:
DOI: https://doi.org/10.1038/082145b0